Sehome High School

Architects: Dykeman Architects

Contractor: Dawson Construction. Bellingham, Wa

Live Edge Tops: Wood was harvested from trees growing on site during ground clearance for new building. The Douglas Fir logs were milled into slabs and dried with dehumidifiers, forced air heat and air flow in a 40 foot container until reaching optimum moisture content.

Scope: Dimensioned, finished and installed the tops used throughout the school in various locations.

Sehome High School
No items found.

Hand rail: Fixtures

Scope: Created fixtures for onsite carpenters to mill copncealed fasteners at each joint in numerous handrails at numerous stairways.

No items found.

Gym Flooring

Scope: Co-ordinated with on-site carpenters to remove flooring from old gymnasium then reused as stair treads wall coverings and benches in the new building.

No items found.