Sehome High School
Architects: Dykeman Architects
Contractor: Dawson Construction. Bellingham, Wa
Live Edge Tops: Wood was harvested from trees growing on site during ground clearance for new building. The Douglas Fir logs were milled into slabs and dried with dehumidifiers, forced air heat and air flow in a 40 foot container until reaching optimum moisture content.
Scope: Dimensioned, finished and installed the tops used throughout the school in various locations.
Hand rail: Fixtures
Scope: Created fixtures for onsite carpenters to mill copncealed fasteners at each joint in numerous handrails at numerous stairways.